Highlights

  • Full year production growth across Copper, Lead and Silver
  • Record quarterly and full year production of mined zinc-lead and integrated silver at Zinc India
   

Zinc - India Business

 
 Q4Q3Full Year

Particulars(in '000 tonnes, or as stated)

FY2013 FY2012 % change YoYFY2013FY2013 FY2012 % change YoY
Mined metal content260 223 16%233870 830 5%
Concentrate Sales - Zinc (MIC)61 -  -61 -  
Concentrate Sales - Lead (MIC)- -  -- 5  
Refined Zinc - Total182 190 (4%)171677 759 (11%)
Refined Zinc - Integrated181 189 (4%)168660 752 (12%)
Refined Zinc - Custom0 1  317 6  
Refined Lead - Total135 37 (6%)32125 99 26%
Refined Lead - Integrated32 31 2%22107 89 20%
Refined Lead - Custom3 6  1018 10  
Silver - Total (in tonnes)2117 88 33%117408 242 69%
Silver - Integrated (in tonnes)100 83 20%62322 237 36%
Silver - Custom (in tonnes)17 5  5586 5  
  1. Includes captive consumption of 1,777 tonnes in Q4 FY2013 vs. 2,156 tonnes in Q4 FY2012, and 6,500 tonnes in FY2013 vs. 6,625 tonnes in FY2012.
  2. Includes captive consumption of 9 tonnes in Q4 FY2013 vs.11 tonnes in Q4 FY2012 and 34 tonnes in FY2013 vs. 35 tonnes in FY2012.

Mined metal production was a record 260,000 tonnes in Q4, 16% higher than the corresponding prior period, and in line with the annual mine plan. Full year production was 870,000 tonnes, 5% higher than the previous year.

The integrated production of refined zinc was 181,000 tonnes in Q4, 8% higher than Q3. Full year production was 660,000 tonnes, in line with the annual plan. Sales of zinc metal-in-concentrate (MIC) were 61,000 tonnes, due to surplus concentrate in Q4. Integrated production of refined lead was 32,000 tonnes in Q4 and 107,000 tonnes for the full year, up 2% and 20% respectively.

Integrated production of silver was a record 100,000 tonnes in Q4 and 322,000 tonnes for the full year, up 20% and 36%, respectively, driven by the continued ramp-up of the SK mine and the Dariba lead smelter.

During the year, Rampura Agucha underground mine and Kayad mine achieved the milestone of development ore production as per plan.

   

Zinc - International Business

 
 Q4Q3Full Year

Particulars(in '000 tonnes)

FY2013 FY2012 % change YoYFY2013FY2013 FY2012 % change YoY
Zinc Refined - Skorpion36 36 2%36145 145 0%
Mined metal content- BMM and Lisheen65 71 (8%)68280 299 (6%)
Total102 106 (4%)104426 444 (4%)
    

Total production of refined zinc and mined zinc-lead MIC was 102,000 tonnes in Q4 and 426,000 tonnes for the full year, in line with the annual mine plan.

   

Copper - India /Australia Business

 
 Q4Q3Full Year

Particulars(in '000 tonnes, or as stated)

FY2013 FY2012 % change YoYFY2013FY2013 FY2012 % change YoY
Copper - Mined metal content7 5 28%626 23 15%
Copper - Cathodes86 80 7%92353 326 8%

Tuticorin power sales (million units)

35 -  742 -  
    

Copper cathode production was 86,000 tonnes in Q4, 7% higher than the corresponding prior period, and 8% higher at 353,000 tonnes in FY2013. Mined metal production at Australia was 28% higher at 7,000 tonnes in Q4 and 15% higher at 26,000 tonnes for the full year.

The first 80MW unit of the 160MW captive power plant at Tuticorin has been stabilised during the quarter and is now operating at capacity, with plant load factor (PLF) of 81% during the quarter. Surplus power generated by this plant beyond the captive consumption requirements were sold, and commercial power sales were 35 million units in Q4 and 42 million units for the full year. The second 80MW unit is expected to be synchronized in Q1 FY2014.

Tuticorin Copper Smelter Update

Following a few public complaints of emissions, we had responded to the queries of the Tamil Nadu Pollution Control Board (TNPCB) confirming that all plant parameters were within permitted limits. The District Administration confirmed that no case of illness was reported on account of the alleged emissions. However, TNPCB ordered closure of the smelter on 29 March 2013.

Separately, on 2 April 2013, the Honourable Supreme Court has upheld our appeal filed in 2010 against the Madras High Court order for smelter closure and ordered us to deposit INR 1 billion (approx. $18mn) with the District Collector, Tuticorin, which will be used to improve the environment, including soil and water, in the vicinity of the plant. Over the two year court process, regulatory bodies had inspected and confirmed that the plant meets the required standards. Some recommendations for improvements had been proposed by them, all of which had been implemented.

This Supreme Court order does not affect the recent closure order issued by TNPCB. We are actively engaged with TNPCB and relevant authorities to obtain permission to restart the operations. We have also filed an appeal with the National Green Tribunal against the closure order by TNPCB and for interim relief to operate the plant, and the matter is being heard.

   

Aluminium Business - Balco

 
 Q4Q3Full Year

Particulars(in '000 tonnes, or as stated)

FY2013 FY2012 % change YoYFY2013FY2013 FY2012 % change YoY
Aluminium62 62 -62247 246 1%
    

Aluminium production at 245 ktpa Korba-II smelter was 62,000 tonnes, in line with the corresponding prior quarter. The smelter operated above its rated capacity for the full year.

At the 325ktpa Korba-III aluminium smelter, mechanical and electrical completion and pre-commissioning of the rectifier, potline and related utilities for the first phase of 84 pots out of the total 336 pots have been completed. Further work is in progress, and we plan to tap first metal in Q2 FY2014. The smelter plans to initially draw power from the existing 810MW power plants at BALCO. The first 300MW unit of the BALCO 1,200MW captive power plant is awaiting final stage regulatory approvals.

Having obtained the Stage-II Forest Clearance for the 211mt coal block at BALCO, the process for diversion of forest land has been initiated by the State Government, and we are in the process of signing the mining lease agreement. We expect to commence mining in Q2 FY2014.

   

Power Business

 
 Q4Q3Full Year
Particulars(in million units)FY2013 FY2012 % change YoYFY2013FY2013 FY2012 % change YoY
SEL 12,073 1,674 24%1,5787,530 5,638 34%
Balco 270 MW282 412 (32%)2751241 1605 (23%)
HZL Wind Power78 80 (2%)62511 336 52%
Total Power Sales2,433 2,166 12%1,9159,282 7,579 22%
    
  1. Includes production under trial run of Nil million units in Q4 FY2013 vs. 209 million units in Q4 FY2012, and 795 million units in FY2013 vs. 926 million units in FY2012.

Power sales were 12% higher at 2,433 million units in Q4 and 22% higher at 9,282 million units for the full year, as compared with the corresponding prior periods. The increase in Q4 was primarily due to higher power generation and sales from three units of the Jharsuguda 2,400MW power plant.

The plant load factor (PLF) of three operating units in Q4 was 58%, compared to 31% in Q3. Overall the station delivered an effective PLF of 44% considering all four units. The fourth unit was commissioned on 31 March 2013. The increase in PLF was driven by the commissioning of the new shared 1,000MW Raipur-Wardha transmission line in January 2013, and partial easing of the evacuation restrictions. We expect 50-60% PLF for all four units in the near future with further easing of evacuation restrictions.

Power sales at BALCO 270MW were lower in Q4 and full year due to evacuation constraints.

Work at the Talwandi Sabo power project is progressing well and the first unit is expected to be synchronized in Q2 FY2014.

About Sterlite Industries

Sterlite Industries (India) Limited is India's largest diversified metals and mining company. The company produces aluminium, copper, zinc, lead, silver, and commercial energy and has operations in India, Australia, Namibia, South Africa and Ireland. The company has a strong organic growth pipeline of projects. Sterlite Industries is listed on the Bombay Stock Exchange and National Stock Exchange in India and the New York Stock Exchange in the United States. For more information, please visit www.sterlite-industries.com

Disclaimer

This press release contains "forward-looking statements" - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.



Sterlite Industries (India) Limited
Ashwin Bajaj, +91 22 6646 1531
Senior Vice President - Investor Relations
sterlite.ir@vedanta.co.in
or
Sheetal Khanduja, +91 22 6646 1531
AGM - Investor Relations
sterlite.ir@vedanta.co.in

KEYWORDS:   United States  Asia Pacific  North America  New York  India

INDUSTRY KEYWORDS:

The article Sterlite Industries (India) Limited Production Release for the Fourth Quarter and Year Ended 31 March 2013 originally appeared on Fool.com.

Try any of our Foolish newsletter services free for 30 days. We Fools may not all hold the same opinions, but we all believe that considering a diverse range of insights makes us better investors. The Motley Fool has a disclosure policy.

Copyright © 1995 - 2013 The Motley Fool, LLC. All rights reserved. The Motley Fool has a disclosure policy.

Read Full Story

Want more news like this?

Sign up for Finance Report by AOL and get everything from business news to personal finance tips delivered directly to your inbox daily!

Subscribe to our other newsletters

Emails may offer personalized content or ads. Learn more. You may unsubscribe any time.

From Our Partners